STEM help / Calculation framework

Results beginning with ‘M’

Maintenance Cost

The cost of maintaining a Resource in a period.

For a Resource: the product of the Calibration Period per-unit Maintenance Cost input, the normalised global and Resource Maintenance Cost Trends, the Maintenance Age Factor and the number of Installed Units.

Include: Standard

Mapping, Mapping (N)

Indicates a proportion of Long-Term Borrowing Required which should be borrowed from a given Debt Facility.

The Mapping input, predicated on the availability of the Debt Facility in a given iteration.

Include: Advanced

Maximum Credit

The borrowing limit for a particular Debt Facility.

The Maximum Credit input (see also Limit).

Include: Standard

 

© Implied Logic Limited